[Suzhou purification equipment] talk about the preparatory work before purification


Clean construction preparation person in charge of the organization of purification project construction team carefully familiar with the drawings, through the design intent, the design of the problem and design and construction and supervision unit contact, so that the problem can be resolved in time, and do a good job of drawing records.


Purification Construction Before installation, it is advisable to energize the test run to verify that the electrodes in the equipment are offset during transport and handling. You can choose to install indoors or outdoors, installed in the outdoor, then add a layer of rain above the machine equipment, so as not to reduce the life of the equipment.


 (21st century) in the electronic information, semiconductor, optoelectronics, precision manufacturing, medicine and health, bio-engineering, aerospace, automotive spraying and many other industries have applications, and according to the industry (industry), the industry is a very wide range of basic industries, Of the precision and clean requirements, the level difference is also larger.


For inoculation, the whole process of bacteria is a particularly important part of the process, in order to minimize the infection rate, inoculation of the environmental requirements are particularly high, the basic to do "without bacteria, no bacteria, completely sterilized." (Including cleaning of qualified valve parts) → closed port measuring piping (Then press the production process to produce piping) → transported to the scene assembled into a closed system.


In the clean room of the purification project construction, the air flow is about an important factor in the performance of the clean room, there are many factors affecting the clean room airflow, such as process equipment, personnel, clean room assembly materials, lighting equipment and so on. Therefore, the clean room of the purification project construction, must have a number of professional cooperation to complete.