苏州净化设备
Your current location: Home >> News >> company news

News

Product

keywords

[Suzhou purification equipment] choose the right purification equipment is very important

Release date:2017-05-26 author: click:

[Suzhou purification equipment] choose the right purification equipment is very important



  Clean room should be regularly tested dust concentration, air outlet out of the wind speed, temperature and humidity, purification equipment according to the results of the measurement to make maintenance programs. Air conditioning purification system within the early, medium and efficient, the filter should be based on changes in wind speed, indoor pressure changes regularly change.


  Regular inspection of air conditioning air supply system running problems in a timely manner, when the air pressure to reduce the need to replace the early, intermediate filter. When the clean room air volume decreased significantly should replace the end of the high efficiency filter, to develop a filter replacement time of the replacement and strict implementation.


  Pay attention to observe the inlet and outlet pressure gauge under normal circumstances, the pressure gauge should be consistent with the number of smooth and no fluctuations in pressure. Compressed air filter in the work, should be gradually boost or decompression Do not remove the case with pressure. The automatic drainage device configured on the filter should be regularly maintained and maintained to prevent dirt clogging the filter and the drain hole should be cleaned once a week.


  Clean the construction of clean air conditioning system installation is complete, must air conditioning, air conditioning room to clean up, clean. All irrelevant objects must be completely removed, and carefully check the air conditioning and the engine room wall, top, ground paint. Whether the damage and make up the equipment to carefully check the filter system, the end of the air supply system can be installed directly. Cleanliness of more than 6 systems can be installed high efficiency filter, carefully check the electrical, automatic control system, power supply system to confirm the system before the test can be completed.


  Installation of the staff to be blowing, wearing dust-free clothing, masks, shoe covers can be carried out construction. Use of the tool material parts to be alcohol scrub, clean paper inspection, meet the requirements before entering the construction site. Duct pipe fittings, parts should be connected to open the head side of the connection, the duct to do oil-free litter should not be easy to aging elastic strength of the material, and shall not be straight stitching after the installation of the end of the opening to remain sealed state.


Related labels:Suzhoupurificationequipment

Recent browse:

S
E
R
V
C
E
share